On Going Project

20/10/2018

As the pictures show all buildings are very damaged due to being exposed to the ever-changing Scottish climate. Demolition required here, clear and get ground prepared for the ground works and foundation construction.

17/10/2018

We are delighted to announce that we have exchanged contracts with our client who has instructed us to convert and restore this property and land, the original buildings consists of one large farmhouse, two barns and two outbuildings.

These buildings have lain dormant for over 40 years. The building conditions will have its challenges both in construction and fundamental feasibility of the project. However we welcome the challenge.

AT A GLANCE

Location Glasgow G69
Estimated Build Duration 9 Months
Build cost Contact Us
Client Private
Date Completed On-Going Project